Operations hall. Hyropower plant, Troizk, Russia

In this project our technologists and constructors designed workstations of operators with integrated computer equipment as well as armored cabinets for documents storage. The tables are made by our craftsmen from artificial stone Corian and tempered black glass (20 mm thickness), the whole construction being mounted on the metal frame. Installation work was performed in tight deadlines, because of the impossibility to stop the functioning of the heart of the hydroelectric plant, namely control room. Exact calculation by design and manufacturing has made it possible to complete the task of installing of such complex objects with no interruption in work of plant’s specialists.